Question : The Ghatampur thermal power plant, approved by Cabinet, is to be set up in__________.
Option 1: Rajasthan
Option 2: Uttar Pradesh
Option 3: Karnataka
Option 4: Madhya Pradesh
Latest: SSC CGL 2024 final Result Out | SSC CGL preparation tips to crack the exam
Don't Miss: SSC CGL Tier 1 Scorecard 2024 Released | SSC CGL complete guide
Suggested: Month-wise Current Affairs | Upcoming Government Exams
Correct Answer: Uttar Pradesh
Solution : The correct answer is Uttar Pradesh.
The Ghatampur thermal power station of Neyveli Lignite Corporation (NLC) is a joint venture between NLC and the Uttar Pradesh government. It will be built in Ghatampur district in Kanpur, Uttar Pradesh, and run on coal. The project would provide 1478.28 MW of energy to Uttar Pradesh and 492.72 MW of energy to Assam.
Candidates can download this ebook to know all about SSC CGL.
Admit Card | Eligibility | Application | Selection Process | Preparation Tips | Result | Answer Key
Question : Which of the following sources has the largest share in power generation in India?
Option 1: Atomic power
Option 2: Thermal power
Option 3: Hydro power
Option 4: Wind power
Question : Which kind of power accounts for the largest share of power generation in India ?
Option 1: hydro-electricity
Option 2: thermal
Option 3: nuclear
Option 4: solar
Question : India exports power to ----
Option 1: Bangladesh
Option 2: Myanmar
Option 3: Pakistan
Option 4: Bhutan
Question : Ethanol containing 5% water is known as
Option 1: rectified spirit
Option 2: denatured spirit
Option 3: methylated alcohol
Option 4: power alcohol
Question : Which of the following produces the most solid waste ?
Option 1: Agriculture
Option 2: Nuclear Power Plants
Option 3: Manufacturing
Option 4: Packaging Industry
Regular exam updates, QnA, Predictors, College Applications & E-books now on your Mobile